Primary Responsibility
• Construct data accumulation systems for a cost accounting system• Create and review the controls needed for data accumulation and reporting system• Update standard costs in the bill of materials• Review standard and actual costs for inaccuracies• Validate the cost of goods sold as part of the month-end close• Accumulate and apply overhead costs as required by generally accepted accounting principle• Work with the materials review board to locate and dispose of obsolete inventory• Conduct ongoing process constraint analyses• Report on breakeven points by products, work centers, and factories• Report on margins by product and division• Report on periodic variances and their causes, focusing in particular on spending variances
Qualification
Qualification
• Maximum 40 years old• Minimum S1 Degree• Minimum 5 Years experience as Project Cost Controller for High Rise building• Fluent in Mic Project or Primavera• Expert at Ms Office• Fluent in English• Stationed at Head Office, Jakarta
Informasi lebih lanjut
Bidang Pekerjaan |
Status Kepegawaian |
Konstruksi
|
Full-Time
|
Pendidikan Terakhir |
Gaji |
-
|
Sesuai Peraturan Perusahaan
|
Tingkat Jabatan |
|
-
|
-
|
Powered By